Skip to content

Latest commit

 

History

History
282 lines (233 loc) · 7.42 KB

File metadata and controls

282 lines (233 loc) · 7.42 KB

Task Tower Development Log

Project Overview

Task Tower is a productivity gamification platform that combines task management with visual tower building mechanics in a multiplayer environment. The game aims to make task completion fun and competitive while providing meaningful productivity insights.

Current State Analysis (April 9, 2025)

Existing Codebase

  1. Core Game Logic

    • Partial implementation in game-core.js
    • Basic task management
    • Incomplete multiplayer system
    • Working UI components
  2. UI Components

    • Player cards
    • Task lists
    • Game controls
    • Basic animations
    • Tailwind CSS implementation
  3. Multiplayer System

    • Lobby system skeleton
    • Basic player management
    • Incomplete synchronization
    • Google Sheets integration (needs migration)
  4. Technical Stack

    • Frontend: HTML/CSS/JavaScript
    • Styling: Tailwind CSS
    • Backend: Google Sheets (to be migrated to Supabase)
    • Real-time: WebSocket (to be implemented)

Development Plan

Phase 1: MVP Fix (1-2 weeks)

  1. Core Game Logic

    • Fix existing bugs
    • Complete task management
    • Implement scoring system
    • Fix multiplayer logic
  2. UI Improvements

    • Polish existing animations
    • Fix responsive issues
    • Improve player cards
    • Add game info modal
  3. Multiplayer

    • Fix lobby system
    • Implement basic sync
    • Add player tracking
    • Fix connection handling

Phase 2: Supabase Migration (3-4 weeks)

  1. Database Setup

    • Create Supabase project
    • Set up database schema
    • Configure RLS
    • Set up Edge Functions
  2. Backend Migration

    • Migrate game state
    • Implement real-time
    • Update lobby system
    • Add authentication
  3. Frontend Updates

    • Update API calls
    • Implement Supabase integration
    • Update state management
    • Fix synchronization

Phase 3: Enhancement (2-3 weeks)

  1. New Features

    • Add sound effects
    • Implement advanced animations
    • Add statistics tracking
    • Improve UI/UX
  2. Performance

    • Optimize animations
    • Improve state management
    • Add caching
    • Fix performance issues
  3. Testing

    • Add unit tests
    • Implement integration tests
    • Add performance tests
    • Test multiplayer

Development Log

2025-04-09 02:59 AM

  • Implemented client-side multiplayer handler
  • Added WebSocket connection management
  • Set up state synchronization
  • Added reconnection logic
  • Working on UI updates

2025-04-09

  • Implemented basic multiplayer manager
  • Added WebSocket connection handling
  • Set up state synchronization
  • Working on task and score updates

2025-04-09 02:56 AM

  • Started implementing WebSocket connection management
  • Working on player connection tracking
  • Setting up state synchronization
  • Implementing basic multiplayer functionality

2025-04-09 02:53 AM

  • Started multiplayer sync implementation
  • Focusing on WebSocket synchronization
  • Working on state management

2025-04-09

  • Core Game Logic Improvements

    • Implemented customizable game settings with validation
    • Added configuration management system
    • Enhanced state management with better validation
    • Improved player management with validation and tracking
    • Added error handling throughout the game core
    • Restructured game initialization process
    • Added player count limits (max 8 players)
    • Added time limits for rounds and breaks
    • Improved game state persistence
  • Task Complexity Features

    • Implemented priority levels (LOW to CRITICAL)
    • Added complexity levels (SIMPLE to VERY_COMPLEX)
    • Created task dependencies system
    • Added tagging system
    • Implemented deadline tracking
    • Added task notes
    • Created progress tracking
    • Enhanced scoring system with comprehensive bonuses
  • Scoring System Enhancements

    • Created comprehensive scoring constants
    • Implemented base point multipliers
    • Added various bonus systems (complexity, priority, efficiency, etc.)
    • Created scoring breakdowns
    • Added streak and teamwork bonuses
    • Implemented optimized scoring calculations
  • Performance Monitoring

    • Set up memory usage tracking
    • Implemented FPS monitoring
    • Added network latency tracking
    • Created optimization strategies
    • Added performance warnings
    • Integrated with game state management
  • Development Tools

    • Moved MCP server to dev-tools directory
    • Clarified MCP server purpose as development tool
    • Separated from core game code

2025-04-08

  • Project Reorganization
    • Cleaned up git history
    • Updated documentation structure
    • Set up testing infrastructure
    • Created development guidelines
    • Updated project specifications

Next Steps (April 9, 2025)

  1. Immediate Tasks

    • Complete scoring system implementation
    • Fix multiplayer synchronization issues
    • Implement task complexity features in UI
    • Add performance optimizations
    • Update documentation
  2. Short-term Goals

    • Complete MVP functionality
    • Fix remaining bugs
    • Improve UI/UX
    • Set up testing framework
    • Document all changes
  3. Long-term Goals

    • Complete Supabase migration
    • Add advanced features
    • Optimize performance
    • Add analytics
    • Prepare for Phase 2

Important Decisions

  1. Technical Stack

    • Keep Tailwind CSS (working well)
    • Migrate to Supabase
    • Use WebSocket for real-time
    • Keep modular architecture
    • MCP server for development only
  2. Game Design

    • Separate screens for players
    • Turn-based gameplay
    • Focus on performance
    • Maintain simplicity
    • Clear separation of development tools
  3. Development Approach

    • MVP first
    • Incremental improvements
    • Focus on stability
    • Regular testing
    • Clear documentation
  4. Development Tools

    • MCP server moved to dev-tools directory
    • Clear separation from game code
    • Development team only
    • Not part of production

Potential Spin-offs and Extensions

  1. Task Management App

    • Standalone task manager
    • Advanced features
    • Integration options
    • Custom workflows
  2. Analytics Platform

    • Productivity insights
    • Time tracking
    • Performance metrics
    • Custom reports
  3. Mobile App

    • Native mobile version
    • Offline support
    • Push notifications
    • Mobile-optimized UI
  4. API Platform

    • Public API
    • Integration options
    • Custom implementations
    • Third-party tools

Development Notes

  1. Code Organization

    • Keep modular structure
    • Use clear naming
    • Maintain documentation
    • Follow coding standards
  2. Testing Strategy

    • Unit tests for core logic
    • Integration tests for multiplayer
    • Performance tests for real-time
    • UI tests for animations
  3. Performance Considerations

    • Optimize animations
    • Efficient state updates
    • Proper caching
    • Network optimization

Important Dates

  • Before April 8, 2025: Initial development of original project and it's variations. Details in /docs/changelog.md. Please update changelog.md by appending on to the beginning of file, marking previous content properly, and adding new content with the suitable formatting as now decided. - User notes.
  • April 9, 2025: Development log created
  • April 23, 2025: MVP target completion
  • May 7, 2025: Supabase migration target
  • May 21, 2025: Enhancement phase target

Notes

  1. Regular updates to this log
  2. Track blockers and issues
  3. Document decisions
  4. Update progress
  5. Maintain focus on goals