Skip to content

Force assigment pawn on work specification #48

@SeanWoo

Description

@SeanWoo

All processes in the world work best under ideal conditions, but in reality the conditions are very different, so manual adjustments are required. I want to force the assignment of a pawn to a certain working specification, because the "Exclude Pawn" function removes a pawn from the entire assignment process, but I don't want this, since only one working specification is important to me.

The logic should be as follows:

  1. In each working specification, a field is added with the ability to select specific pawns.
  2. When a pawn is selected, it is assigned to the working specification within the limits for the maximum number of pawns in the working specification, or above the limit if people have already been assigned.
  3. The pawn is assigned all the work according to the standard priorities, but does not rely on the conditions of the assignment.

That would be great:

  1. When selecting each pawn, be able to put a check mark that allows you to disable the execution of the Post Proccessor. (I want to temporarily replace the doctor with the cook, but I don't want to change his title, change his work area, or change his clothes)

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or requestuser requestThis has been requested by a user.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions