Skip to content

update requirements.txt #43

update requirements.txt

update requirements.txt #43

Triggered via push October 8, 2025 20:15
Status Failure
Total duration 28s
Artifacts

tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.9)
Process completed with exit code 1.
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_9" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_9" failed