Milestones

List view

  • At this point, the robot must be able to find corners, map the edges of the board and from there be able to erase the entire board.

    Overdue by 7 year(s)
    Due by November 20, 2018
  • This is milestone is defined by the ability to detect a corner and then be able to move around that corner. This will be a critical step in covering the entire board.

    Overdue by 7 year(s)
    Due by October 25, 2018
  • This milestone will be largely defined by the robot's ability to move on a whiteboard. This will be both the ability for the robot to move under its own power and its ability to drive in a straight line. This will require implementing code for the motors and motor controller along with a controls system to drive in a straight line. A P-controller or even PID controller needs to be implemented.

    Overdue by 7 year(s)
    Due by October 20, 2018
  • This milestone will be largely dictated by code that successful commands all electronics on the robots and produces an observable result.

    Overdue by 7 year(s)
    Due by October 15, 2018
    4/4 issues closed