π¬ StreamCaster β Daily Status Report
Date: March 23, 2026 | Build flavors: foss + gms | Package: com.port80.app
π Recent Activity Highlights
π¦ Releases
- v0.0.1 shipped on March 15 β first public release! The app builds and installs via sideload (see
SIDELOAD_INSTRUCTIONS.md).
π Open Pull Requests (2)
| # |
Title |
Status |
Priority |
#5 |
Fix: energy-saving mode stops RTMP stream |
π‘ Draft |
π΄ Critical |
#6 |
No changes: non-actionable issue |
π‘ Draft |
β¬οΈ Low |
PR #5 is the most important one to act on β it addresses a major regression where activating the energy-saving screen-dimming mode kills the live RTMP stream. The proposed fix is elegant: keep the CameraPreview SurfaceView always in the Compose composition and layer a dark overlay on top, so the encoder never loses its frame source. Ready for review!
π¨ Recent Commits (last week)
- β
T-035 complete β QA acceptance test suite with 150 tests passing (StreamConfig, ABR ladder, media mode transitions, endpoint profiles, camera switcher, battery monitor)
- β
OpenGlView integration + default profile seeding
- β
APK release GitHub Actions workflow (supports input tag)
- β
Failure diagnostics for streaming service and UI
- β
Control panel icon refactor
- β
Material Icons dependency added
- β
Daily repo-status agentic workflow added π€
π Project Status
Phase Progress
| Phase |
Description |
Status |
| Phase 1 |
Core Streaming MVP |
β
Complete |
| Phase 2 |
Settings & Configuration |
π In progress |
| Phase 3 |
Resilience & Polish |
π Up next |
| Phase 4 |
Secondary features |
β³ Queued |
| Phase 5 |
Overlay, H.265, SRT, multi-dest |
π« Out of scope |
The QA test suite (T-035) completing with 150 passing tests is a big milestone β great signal that the data layer and core logic are solid. π
Key Architecture Health
- π Credential storage: EncryptedSharedPreferences + Keystore β β
- π FGS security: profile ID only in Intent extras β β
- π‘οΈ Log redaction:
CredentialSanitizer in place β β
- ποΈ Encoder serialization:
Mutex-guarded EncoderController β β
π― Recommended Next Steps
-
π Review & merge PR #5 β The energy-saving stream fix is ready and critical for usability. The pure-UI-overlay approach is architecturally correct and doesn't touch the encoder.
-
ποΈ Close PR #6 β The draft for the unrelated calendar query can be closed as it has no actionable scope.
-
βοΈ Phase 2 settings screens β With Phase 1 solid, EndpointScreen, VideoAudioSettingsScreen, and GeneralSettingsScreen are the natural next targets.
-
π Reconnect & ABR β ConnectionManager exponential backoff and AbrPolicy are key resilience features for Phase 3.
-
π§ͺ Instrumented tests β Consider adding connectedFossDebugAndroidTest coverage for the FGS lifecycle and surface binding.
Auto-generated by the daily-repo-status workflow π€ | StreamCaster v0.0.1
Generated by Daily Repo Status Β· β·
To install this agentic workflow, run
gh aw add githubnext/agentics/workflows/daily-repo-status.md@1199e4a230756fb94a382496a73e689091aa4b6b
π¬ StreamCaster β Daily Status Report
π Recent Activity Highlights
π¦ Releases
SIDELOAD_INSTRUCTIONS.md).π Open Pull Requests (2)
#5#6PR
#5is the most important one to act on β it addresses a major regression where activating the energy-saving screen-dimming mode kills the live RTMP stream. The proposed fix is elegant: keep theCameraPreviewSurfaceView always in the Compose composition and layer a dark overlay on top, so the encoder never loses its frame source. Ready for review!π¨ Recent Commits (last week)
π Project Status
Phase Progress
The QA test suite (T-035) completing with 150 passing tests is a big milestone β great signal that the data layer and core logic are solid. π
Key Architecture Health
CredentialSanitizerin place β βMutex-guardedEncoderControllerβ βπ― Recommended Next Steps
π Review & merge PR
#5β The energy-saving stream fix is ready and critical for usability. The pure-UI-overlay approach is architecturally correct and doesn't touch the encoder.ποΈ Close PR
#6β The draft for the unrelated calendar query can be closed as it has no actionable scope.βοΈ Phase 2 settings screens β With Phase 1 solid,
EndpointScreen,VideoAudioSettingsScreen, andGeneralSettingsScreenare the natural next targets.π Reconnect & ABR β
ConnectionManagerexponential backoff andAbrPolicyare key resilience features for Phase 3.π§ͺ Instrumented tests β Consider adding
connectedFossDebugAndroidTestcoverage for the FGS lifecycle and surface binding.Auto-generated by the daily-repo-status workflow π€ | StreamCaster v0.0.1