-
Notifications
You must be signed in to change notification settings - Fork 3
Description
Phase 3: Visualization & Diagnostics
🎯 Phase Objective
Implement Visualization & Diagnostics as part of the overall plan: Plasma Instability Detection Module
🧠 Phase Context
This is Phase 3 of the implementation plan. It focuses on Visualization & Diagnostics with an estimated duration of 4-6 hours.
📋 Implementation Tasks
Task Group 1: Core Implementation
-
Design and Architecture (Est: 2 hours) - Define technical approach and design patterns
- Commit:
<checksum> - Status: Pending
- Notes: Create technical design document and validate approach
- Commit:
-
Core Implementation (Est: 4-6 hours) - Implement main functionality
- Commit:
<checksum> - Status: Pending
- Notes: Follow SolarWindPy coding conventions and physics validation requirements
- Commit:
-
Integration Testing (Est: 2 hours) - Validate integration with existing system
- Commit:
<checksum> - Status: Pending
- Notes: Ensure compatibility with existing physics calculations and data structures
- Commit:
Task Group 2: Quality Assurance
-
Unit Tests (Est: 2 hours) - Create comprehensive test coverage
- Commit:
<checksum> - Status: Pending
- Notes: Target ≥95% coverage following SolarWindPy testing standards
- Commit:
-
Documentation (Est: 1 hour) - Update documentation and examples
- Commit:
<checksum> - Status: Pending
- Notes: Include NumPy-style docstrings and usage examples
- Commit:
✅ Phase Acceptance Criteria
- All task group implementations completed and tested
- Integration tests passing with existing SolarWindPy modules
- Code coverage ≥95% for new functionality
- Documentation updated with clear examples
- Physics validation requirements satisfied (if applicable)
- Pre-commit hooks passing (black, flake8, pytest)
🧪 Phase Testing Strategy
Testing Approach:
- Unit tests for individual functions and classes
- Integration tests with existing SolarWindPy components
- Physics validation tests (if applicable)
- Performance benchmarks for critical paths
Test Categories:
- Functional correctness
- Edge case handling
- Error condition management
- Scientific accuracy validation
🔧 Phase Technical Requirements
Dependencies: Phase 1,2
Duration: 4-6 hours
Priority: Phase 3 implementation
Technical Constraints:
- Follow SolarWindPy hierarchical DataFrame patterns
- Maintain SI unit conventions internally
- Preserve NaN handling for missing data
- Ensure backward compatibility
📂 Phase Affected Areas
Primary Impact:
- Implementation area specific to Visualization & Diagnostics
Secondary Impact:
- Related testing modules
- Documentation and examples
- Integration points with existing functionality
📊 Phase Progress Tracking
Completion Status: 0% (0/10 tasks completed)
Progress Metrics:
- Design complete
- Implementation complete
- Testing complete
- Documentation complete
- Integration validated
💬 Phase Implementation Notes
Implementation Priority: Sequential execution recommended
Key Considerations:
- Maintain SolarWindPy coding standards throughout
- Coordinate with physics validation if core modules affected
- Update cross-references to overview issue [Plan Overview]: Plasma Instability Detection Module #379
🔄 Context Management Points
Session Boundaries:
- Complete task groups as atomic units
- Create compacted states after significant milestones
- Preserve implementation decision rationale
Token Optimization:
- Use structured progress updates
- Link commits to specific tasks for efficient context
- Maintain clear success criteria for each task
👤 Phase Completion Instructions
When Ready to Mark Complete:
- Verify all acceptance criteria met
- Update progress tracking to 100%
- Link all commits to respective tasks
- Update overview issue [Plan Overview]: Plasma Instability Detection Module #379 with completion status
- Create compacted state for session continuity
🔗 Related Issues
Plan Overview: #379
Dependencies: Phase 1,2
Next Phase: Will be determined based on overall plan structure
This phase is part of the comprehensive GitHub Issues Plan Management System. Use structured task tracking to maintain implementation quality and progress visibility.