Skip to content

Update Notecard API from upstream schema changes (10f67e432b3c1df5a62… #537

Update Notecard API from upstream schema changes (10f67e432b3c1df5a62…

Update Notecard API from upstream schema changes (10f67e432b3c1df5a62… #537

Triggered via push March 2, 2026 16:06
Status Failure
Total duration 46s
Artifacts
Matrix: build / build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build / build (3.11)
Process completed with exit code 1.
build / build (3.12)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.12)
The operation was canceled.
build / build (3.14)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.14)
The operation was canceled.
build / build (3.10)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.10)
The operation was canceled.
build / build (3.13)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.13)
The operation was canceled.