upgrade to python 3.10 (and pydantic2) #631
codecov.yml
on: pull_request
Matrix: π€ Call SDK test workflow / π§ͺ Test with coverage
π€ Call SDK test workflow
/
βοΈ Upload coverage to Codecov
0s
Annotations
7 errors
|
π€ Call SDK test workflow / π§ͺ Test with coverage (3.12)
Process completed with exit code 2.
|
|
π€ Call SDK test workflow / π§ͺ Test with coverage (3.13)
Process completed with exit code 2.
|
|
π€ Call SDK test workflow / π§ͺ Test with coverage (3.13)
The strategy configuration was canceled because "test-and-codecov.test._3_12" failed
|
|
π€ Call SDK test workflow / π§ͺ Test with coverage (3.10)
The operation was canceled.
|
|
π€ Call SDK test workflow / π§ͺ Test with coverage (3.10)
The strategy configuration was canceled because "test-and-codecov.test._3_12" failed
|
|
π€ Call SDK test workflow / π§ͺ Test with coverage (3.11)
The operation was canceled.
|
|
π€ Call SDK test workflow / π§ͺ Test with coverage (3.11)
The strategy configuration was canceled because "test-and-codecov.test._3_12" failed
|