-
Notifications
You must be signed in to change notification settings - Fork 0
Open
Description
There appears to be an issue transferring large files over scp onto an Altis Cloud environment. The result is a transfer that stalls when it reaches 100% on the progress bar, shows the total size in MB as having been transferred in full, but the transfer never actually completes. When attempting to work with the transferred file it may or may not be complete enough. For example, trying to unzip a zip archive that stalled on 100% will result in a "End-of-central-directory signature not found" error.
I'm not sure at what size the problem becomes apparent. I've successfully transferred zips up to 162MB. A zip of 370MB will stall at 100% and not complete. I wonder if this may be related to the available disk space on the target environment.
To reproduce
- Create a zip file >= 370MB in size
- Transfer it with
altis-cli stack scp <from> <to> - Observe that the transfer will stall at 100%, but will never finish, and the transfer itself is not actually complete
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
No labels