-
Notifications
You must be signed in to change notification settings - Fork 616
Open
Description
Estimate: 1 day
Sprint: Week 4
Assignee: [Developer]
Description
Create comprehensive documentation for the new JSON configuration system, including migration guide, schema reference, and examples.
Tasks
- Create user migration guide
- Document JSON schemas
- Create configuration examples
- Update developer documentation
- Create troubleshooting guide
- Add IntelliSense setup instructions
Acceptance Criteria
- ✅ Migration guide complete and tested
- ✅ All JSON schemas documented
- ✅ Example files for each config type
- ✅ Developer guide updated
- ✅ Troubleshooting common issues documented
- ✅ VS Code IntelliSense setup documented
Documentation Structure
# ACAT JSON Configuration Guide
## Migration from XML
[Instructions for using ConfigMigrationTool]
## Configuration Files
### ActuatorSettings.json
**Location:** `%APPDATA%\ACAT\Config\ActuatorSettings.json`
**Schema Reference:**
- `actuators` (array, required): List of input devices
- `name` (string, required): Device name
- `enabled` (boolean): Enable/disable device
- `switches` (array): Button/key mappings
**Example:**
```json
{
"actuators": [
{
"name": "Keyboard",
"enabled": true,
"switches": [
{ "name": "Enter", "action": "Select" }
]
}
]
}VS Code IntelliSense Setup
[Instructions for associating schemas]
Troubleshooting
[Common issues and solutions]
### Dependencies
- Ticket #7, #8, #9 (System complete)
---
## 🎫 Ticket #11: Phase 1 Integration Testing
**Labels:** `phase-1-foundation`, `test`, `P1-High`, `integration`
**Estimate:** 1 day
**Assignee:** [Developer]
**Sprint:** Week 4
### Description
Comprehensive integration testing of Phase 1 deliverables: logging and configuration systems working together.
### Test Scenarios
- [ ] **Fresh Install**
- Clean user directory
- Launch ACAT
- Verify default configs created (JSON)
- Verify logs created
- [ ] **XML Migration**
- User has existing XML configs
- Run migration tool
- Launch ACAT with new JSON configs
- Verify all settings preserved
- [ ] **Logging in Production**
- Configure production log levels
- Run ACAT for 10 minutes
- Check log files created
- Verify performance impact minimal
- [ ] **Configuration Validation**
- Create invalid JSON config
- Launch ACAT
- Verify user-friendly error message
- Verify fallback to defaults
### Acceptance Criteria
- ✅ All scenarios pass
- ✅ No regressions in existing features
- ✅ Log files created correctly
- ✅ JSON configs load correctly
- ✅ Migration tool works end-to-end
- ✅ Performance impact < 5%
- ✅ Test results documented
### Performance Validation
```csharp
[TestMethod]
public void LoggingPerformanceTest()
{
var logger = GetLogger();
var stopwatch = Stopwatch.StartNew();
for (int i = 0; i < 10_000; i++)
{
logger.LogInformation("Test message {Index}", i);
}
stopwatch.Stop();
// Should be < 100ms for 10K logs
Assert.IsTrue(stopwatch.ElapsedMilliseconds < 100,
$"Logging too slow: {stopwatch.ElapsedMilliseconds}ms");
}
Dependencies
- All Phase 1 tickets complete
🎫 Ticket #12: Phase 1 Documentation & Handoff
Labels: phase-1-foundation, docs, P1-High
Estimate: 0.5 days
Assignee: [Developer]
Sprint: Week 4
Description
Final documentation, knowledge transfer, and preparation for Phase 2.
Tasks
- Update ACAT_MODERNIZATION_PLAN.md with Phase 1 completion
- Document lessons learned
- Create Phase 1 retrospective
- Generate metrics report
- Prepare Phase 2 kickoff materials
Phase 1 Metrics Report
# Phase 1 Completion Report
## Objectives Met
- ✅ Logging modernized (3,891 calls converted)
- ✅ JSON configuration system implemented
- ✅ Migration tool created
- ✅ All tests passing
## Metrics
- Files modified: [count]
- Lines of code changed: [count]
- Tests added: [count]
- AI acceleration: 2.3x (estimate vs actual)
## Performance Impact
- Startup time: [before] → [after]
- Logging overhead: [before] → [after]
- Configuration load time: [before] → [after]
## Lessons Learned
[Document what worked well, what didn't]
## Risks for Phase 2
[Any issues discovered during Phase 1]
## Recommendations
[Suggestions for Phase 2]Deliverables
- ✅ Completion report
- ✅ Updated modernization plan
- ✅ Retrospective notes
- ✅ Phase 2 kickoff deck
- ✅ Knowledge transfer session scheduled
Dependencies
- All Phase 1 tickets complete
📊 Phase 1 Summary
Timeline
- Week 1: Tickets DOC: Add url with MSDN review and screenshots. #1, ACAT Vision: "This app can't run on your PC" #2, Fatal error. Error setting word prediction engine to [Presage Word Predictor] #3 (Logging)
- Week 2: Tickets Restarting the Presage engine #4, Fatal error. Error setting word prediction engine to [Presage Word Predictor] #5 (Logging cleanup)
- Week 3: Tickets Port to GNU/Linux platform request #6, More Language Support? #7, Add Appveyor.yml for enabling continuous build #8 (Configuration analysis & setup)
- Week 4: Tickets Support for iOS devices #9, acat_gestures.exe has stopped working #10, Localization. #11, ACATsetup.exe not found in downloaded acat-0.9.1.zip #12 (Configuration implementation & testing)
Dependencies Graph
#1 (Logging Setup)
├─→ #2 (Log Migration)
│ └─→ #3 (DI Entry Points)
│ └─→ #4 (Tests)
│ └─→ #5 (Cleanup)
│
#6 (XML Analysis)
└─→ #7 (JSON Schemas)
└─→ #8 (Migration Tool)
└─→ #9 (JSON Loading)
└─→ #10 (Documentation)
└─→ #11 (Integration Tests)
└─→ #12 (Handoff)
Success Criteria
- ✅ All logging uses ILogger
- ✅ All config files migrated to JSON
- ✅ No XML parsing for configuration
- ✅ Structured logging working
- ✅ Migration tool available for users
- ✅ Documentation complete
- ✅ All tests passing
- ✅ Ready for Phase 2
🚀 Getting Started with Phase 1
Day 1 Checklist
- Create GitHub milestone: "Phase 1: Foundation"
- Create all 12 issues from this document
- Assign to developers
- Set up project board
- Schedule kickoff meeting
- Review AI prompts with team
- Set up development environment
Team Assignments (Example)
- Lead Developer: Tickets DOC: Add url with MSDN review and screenshots. #1, ACAT Vision: "This app can't run on your PC" #2, Fatal error. Error setting word prediction engine to [Presage Word Predictor] #3, Support for iOS devices #9 (critical path)
- Developer 2: Tickets Port to GNU/Linux platform request #6, More Language Support? #7, Add Appveyor.yml for enabling continuous build #8 (configuration)
- Developer 3: Tickets Restarting the Presage engine #4, Fatal error. Error setting word prediction engine to [Presage Word Predictor] #5, acat_gestures.exe has stopped working #10, Localization. #11, ACATsetup.exe not found in downloaded acat-0.9.1.zip #12 (testing & docs)
Weekly Standups
- Monday: Plan week, assign tickets
- Wednesday: Mid-week check-in, unblock issues
- Friday: Demo completed work, retrospective
End of Phase 1 Tickets
Ready to copy/paste into GitHub Issues or Azure DevOps!
Reactions are currently unavailable