Skip to content

Update actions/checkout action to v6 #721

Update actions/checkout action to v6

Update actions/checkout action to v6 #721

Triggered via pull request November 21, 2025 10:52
Status Failure
Total duration 48s
Artifacts

build.yaml

on: pull_request
Matrix: docker
Fit to window
Zoom out
Zoom in

Annotations

3 errors
docker (controlplane)
buildx failed with: ERROR: failed to build: failed to solve: process "/bin/sh -c CGO_ENABLED=0 GOOS=${TARGETOS:-linux} GOARCH=${TARGETARCH} go build -a -o manager ./controlplane" did not complete successfully: exit code: 1
docker (tetrad)
The strategy configuration was canceled because "docker.controlplane" failed
docker (tetrad)
The operation was canceled.