Skip to content

Update pyproject.toml #157

Update pyproject.toml

Update pyproject.toml #157

Triggered via push July 11, 2025 14:27
Status Failure
Total duration 2m 0s
Artifacts

run-tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 1.
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed