From c966055a44266004510dfac62532e6f3a13edc23 Mon Sep 17 00:00:00 2001 From: Pandit Dhamdhere <85685981+panditdhamdhere@users.noreply.github.com> Date: Mon, 30 Dec 2024 14:55:49 +0530 Subject: [PATCH] Update DrawAuction.md update with minor typos. --- docs/design/DrawAuction.md | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/docs/design/DrawAuction.md b/docs/design/DrawAuction.md index 977bdec..d4d2aad 100644 --- a/docs/design/DrawAuction.md +++ b/docs/design/DrawAuction.md @@ -83,7 +83,7 @@ To solve this issue, a pricing function is needed that can: Given a target fractional bid price P where 0 ≤ P ≤ 1, and a target bid time T, where 0 < T ≤ 1 the strictly-increasing pricing function needs to start at price 0.0, reach P at time T, and end at price 1.0. -The following solution uses two mirrored pabarabolic curves that meet at point (T,P) and significantly slow down the auction price change near the target sale. +The following solution uses two mirrored parabolic curves that meet at point (T,P) and significantly slow down the auction price change near the target sale. **When x <= T:**