Skip to content

chore(site-em): EM cycle 2026-03-31T08:40Z — site green, CHANGELOG gap P2#1499

Merged
jpleva91 merged 2 commits intomainfrom
chore/site-em-20260331-084000
Mar 31, 2026
Merged

chore(site-em): EM cycle 2026-03-31T08:40Z — site green, CHANGELOG gap P2#1499
jpleva91 merged 2 commits intomainfrom
chore/site-em-20260331-084000

Conversation

@jpleva91
Copy link
Copy Markdown
Collaborator

Site EM Cycle — 2026-03-31T08:40Z

Identity: claude-code:opus:site:em
Health: 🟢 GREEN

Actions This Cycle

Site Stats

  • check-site-stats.sh: 14/14 checks pass — no drift
  • Verified: invariants 26, destructive patterns 92, event kinds 48, action types 43, CLI commands 35

Content Fix

  • fix(docs): sync docs/blog/owasp-agentic-top10-agentguard.md — action types 41→43, invariants 24→26 (content drift, pre-existing local modification)

PR Queue

Persistent Escalation

Issue Status Cycles
CHANGELOG gap (v2.8.1 → v2.10.3) P2, blocks #1260 hero copy 4

Dogfood

  • 0 governance denials this run — git, gh, bash operations clean

🤖 Generated with Claude Code

jpleva91 and others added 2 commits March 31, 2026 06:10
…olved, CHANGELOG gap P2

- Site stats 14/14 passing (no drift)
- No open PRs in site queue
- PR #1448 (fix: allow-path stderr) merged by kernel team — P1 escalation resolved
- CHANGELOG gap (v2.8.1 → v2.10.3) persists as P2 blocker for #1260 hero copy
- fix(docs): sync owasp blog action types 41→43 and invariants 24→26

🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
…cycles no draft), #1379 red line alert, #1444 P0 new

- Escalated #1387 (containment post) to @jpleva91 via GitHub comment — 4th consecutive cycle with no draft
- Filed red line alert on #1379 (Meta demo) — 5 days to April 5 deadline, no engineering start
- Added #1444 (marketing site rebrand) as P0 conference sprint item
- Updated product stats: invariants 25→26, destructive patterns 93→92, tests 4693
- OWASP blog already corrected by site-em (ef5890b); noted in report
- Conference status: AT RISK (health: RED)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
@jpleva91
Copy link
Copy Markdown
Collaborator Author

Marketing EM Cycle — 2026-03-31T08:00Z

Agent: claude-code:opus:marketing:em
Health: 🔴 RED (held)

Actions This Cycle

Product Stat Updates

Stat Prior Current
Invariants 25 26 (no-verify-bypass, cross-repo-blast-radius added)
Destructive Patterns 93 92 (one removed)
Tests 4614 4693
Action Types 43 43 ✓
Event Kinds 48 48 ✓

Site check-site-stats.sh: all checks pass ✓

Sprint Status

Issue Status
#1387 Containment post 🔴 ESCALATED — awaiting human decision
#1382 Conference narrative 🟡 HIGH — 15 days, not started
#1379 Meta demo 🔴 RED LINE — 5 days
#1444 Marketing site rebrand 🆕 P0 — blocked on #1443 design system
#1260 v2.10.3 announcement ⏳ Queued after #1387

Dogfood

0 governance denials. Monitoring #1473 (no-governance-self-modification blocks .agentguard/squads/ writes — filed by analytics-em, marketing writes successful this cycle).

@jpleva91 jpleva91 merged commit e208dba into main Mar 31, 2026
4 checks passed
@jpleva91 jpleva91 deleted the chore/site-em-20260331-084000 branch March 31, 2026 07:14
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant