Skip to content

chore: Configure Renovate#7

Open
renovate[bot] wants to merge 1 commit intomasterfrom
renovate/configure
Open

chore: Configure Renovate#7
renovate[bot] wants to merge 1 commit intomasterfrom
renovate/configure

Conversation

@renovate
Copy link
Copy Markdown

@renovate renovate bot commented Mar 1, 2026

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • .github/workflows/update-rules.yml (github-actions)
  • architectures/sync/mise.toml (mise)
  • scripts/mise.toml (mise)
  • architectures/sync/package.json (npm)
  • architectures/sync/packages/core/package.json (npm)
  • architectures/sync/samples/cra-project/package.json (npm)
  • architectures/sync/samples/shared/package.json (npm)
  • architectures/sync/samples/vite-project/package.json (npm)
  • scripts/requirements.txt (pip_requirements)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Hopefully safe environment variables to allow users to configure.
  • Show all Merge Confidence badges for pull requests.
  • Enable Renovate Dependency Dashboard creation.
  • Use semantic commit type fix for dependencies and chore for all others if semantic commits are in use.
  • Ignore node_modules, bower_components, vendor and various test/tests (except for nuget) directories.
  • Group known monorepo packages together.
  • Use curated list of recommended non-monorepo package groupings.
  • Show only the Age and Confidence Merge Confidence badges for pull requests.
  • Apply crowd-sourced package replacement rules.
  • Apply crowd-sourced workarounds for known problems with packages.
  • Ensure that every dependency pinned by digest and sourced from GitHub.com contains a link to the commit-to-commit diff
  • Correctly link to the source code for golang.org/x packages
  • Link to pkg.go.dev/... for golang.org/x packages' title

🔡 Do you want to change how Renovate upgrades your dependencies? Add your custom config to renovate.json in this branch. Renovate will update the Pull Request description the next time it runs.


What to Expect

With your current configuration, Renovate will create 16 Pull Requests:

chore(deps): update dependency @​types/react to v18.3.28
  • Schedule: ["at any time"]
  • Branch name: renovate/react-monorepo
  • Merge into: master
  • Upgrade @types/react to 18.3.28
chore(deps): update dependency google-generativeai to v0.8.6
  • Schedule: ["at any time"]
  • Branch name: renovate/google-generativeai-0.x
  • Merge into: master
  • Upgrade google-generativeai to ==0.8.6
chore(deps): update dependency ruff to v0.15.4
  • Schedule: ["at any time"]
  • Branch name: renovate/ruff-0.x
  • Merge into: master
  • Upgrade ruff to ==0.15.4
fix(deps): update dependency nostr-tools to v2.23.3
  • Schedule: ["at any time"]
  • Branch name: renovate/nostr-tools-2.x
  • Merge into: master
  • Upgrade nostr-tools to 2.23.3
chore(deps): update actions/checkout action to v4.3.1
  • Schedule: ["at any time"]
  • Branch name: renovate/actions-checkout-4.x
  • Merge into: master
  • Upgrade actions/checkout to v4.3.1
chore(deps): update dependency assemblyscript to v0.28.9
  • Schedule: ["at any time"]
  • Branch name: renovate/assemblyscript-0.x
  • Merge into: master
  • Upgrade assemblyscript to 0.28.9
chore(deps): update dependency python to v3.14.3
  • Schedule: ["at any time"]
  • Branch name: renovate/python-3.x
  • Merge into: master
  • Upgrade python to 3.14.3
chore(deps): update node.js to v25.7.0
  • Schedule: ["at any time"]
  • Branch name: renovate/node-25.x
  • Merge into: master
  • Upgrade node to 25.7.0
chore(deps): update stefanzweifel/git-auto-commit-action action to v5.2.0
chore(deps): update actions/checkout action to v6
  • Schedule: ["at any time"]
  • Branch name: renovate/actions-checkout-6.x
  • Merge into: master
  • Upgrade actions/checkout to v6.0.2
chore(deps): update dependency @​vitejs/plugin-react to v5
  • Schedule: ["at any time"]
  • Branch name: renovate/vitejs-plugin-react-5.x
  • Merge into: master
  • Upgrade @vitejs/plugin-react to 5.1.4
chore(deps): update dependency ubuntu to v24
  • Schedule: ["at any time"]
  • Branch name: renovate/ubuntu-24.x
  • Merge into: master
  • Upgrade ubuntu to 24.04
chore(deps): update dependency vite to v7
  • Schedule: ["at any time"]
  • Branch name: renovate/vite-7.x
  • Merge into: master
  • Upgrade vite to 7.3.1
chore(deps): update stefanzweifel/git-auto-commit-action action to v7
fix(deps): update dependency rxdb to v16
  • Schedule: ["at any time"]
  • Branch name: renovate/rxdb-16.x
  • Merge into: master
  • Upgrade rxdb to 16.21.1
fix(deps): update react monorepo to v19 (major)

🚸 PR creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or overwhelm the project. See docs for prHourlyLimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR was generated by Mend Renovate. View the repository job log.

@semanticdiff-com
Copy link
Copy Markdown

semanticdiff-com bot commented Mar 1, 2026

Review changes with  SemanticDiff

Changed Files
File Status
  renovate.json  0% smaller

@sonarqubecloud
Copy link
Copy Markdown

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants