Open
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Goal
Generate governance-ready artifacts and a concise metrics snapshot for Lab 10. Import scanner outputs into the local DefectDojo instance, capture current counts by severity, produce a findings CSV for spreadsheet analysis, and prepare a short submission summarizing top CWE/OWASP categories and SLA exposure.
Changes
labs/submission10.mdwith a paraphrased English Key Metrics report that uses actual data from the lab artifacts.labs/lab10/report/metrics-snapshot.mdwith verified active counts by severity (snapshot date: Nov. 8, 2025).labs/lab10/report/findings.csvand used it as the primary data source for per-tool counts and CWE frequency. No scanner output files were modified.Testing
labs/lab10/report/metrics-snapshot.md:labs/lab10/report/findings.csv:2025-11-19infindings.csv: eight critical findings share that deadline (7 days after the snapshot date).Artifacts & Screenshots
labs/lab10/report/metrics-snapshot.md— metrics snapshot (Nov. 8, 2025) with severity totals and a short note on verified vs mitigated counts.labs/lab10/report/findings.csv— findings exported/available for spreadsheet analysis; used as the data source for per-tool and CWE counts.labs/lab10/report/dojo-report.pdf.Checklist