Skip to content

Conversation

@clams-bot
Copy link

(no connected issue)
This PR registers the app smolvlm2-captioner.v0.2 from https://github.com/clamsproject/app-smolvlm2-captioner/tree/v0.2. Carefully review the metadata before merging. If something is wrong with the metadata, please close the PR and let the app developer know.
(submitted by @kelleyl)

@clams-bot clams-bot added this to infra Nov 20, 2025
@github-project-automation github-project-automation bot moved this to Todo in infra Nov 20, 2025
@keighrim
Copy link
Member

Why two versions? 0.1 was never "released" so I think we can just re-use the same version number...? (also stilll not seeing tfLabel and wonder if it's intentionally missing)

@kelleyl
Copy link
Contributor

kelleyl commented Nov 20, 2025

Youre right, Ill retag this commit as 0.1. I havent added tfLabel because the timeframe filtering is done based on the labels present in the prompt_map or in the config file. I may be misunderstanding though so correct me if I'm missing something. The purpose of that param would just be to specify which timeframes to run on, right?

@keighrim
Copy link
Member

No I think pMap should server the same purpose. Thanks for clarification.

@kelleyl
Copy link
Contributor

kelleyl commented Nov 20, 2025

retagging as v0.2

@kelleyl kelleyl closed this Nov 20, 2025
@github-project-automation github-project-automation bot moved this from Todo to Done in infra Nov 20, 2025
@clams-bot clams-bot deleted the register/0-smolvlm2-captioner.v0.2 branch November 20, 2025 15:34
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Archived in project

Development

Successfully merging this pull request may close these issues.

4 participants