Skip to content

Conversation

@clams-bot
Copy link

(no connected issue)
This PR registers the app smolvlm2-captioner.v0.1 from https://github.com/clamsproject/app-smolvlm2-captioner/tree/v0.1. Carefully review the metadata before merging. If something is wrong with the metadata, please close the PR and let the app developer know.
(submitted by @kelleyl)

@clams-bot clams-bot added this to infra Nov 21, 2025
@github-project-automation github-project-automation bot moved this to Todo in infra Nov 21, 2025
@keighrim
Copy link
Member

Is this a duplicate to #228 ? Or a new version mis-tagged with an old version?

@keighrim
Copy link
Member

I took down v0.1 image from https://github.com/clamsproject/app-smolvlm2-captioner/pkgs/container/app-smolvlm2-captioner/versions because we already published a different image as v0.1 . Closing this without merge. I think you need to find the exact commit submitted as v0.1 previous and re-tag it as 0.1 then re-tag the actual (current) commit you want to publish for the data type fix as v0.2.

@keighrim keighrim closed this Nov 22, 2025
@github-project-automation github-project-automation bot moved this from Todo to Done in infra Nov 22, 2025
@clams-bot clams-bot deleted the register/0-smolvlm2-captioner.v0.1 branch November 22, 2025 22:43
@keighrim
Copy link
Member

By the way, at this point, since I took down the existing (wrongly versioned) 0.1 image, there's no 0.1 image that's specified in the appdir page.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Archived in project

Development

Successfully merging this pull request may close these issues.

3 participants