Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension


Conversations
Failed to load comments.
Loading
Jump to
The table of contents is too big for display.
Diff view
Diff view
  •  
  •  
  •  
57 changes: 5 additions & 52 deletions .github/workflows/codecov.yml
Original file line number Diff line number Diff line change
Expand Up @@ -17,55 +17,8 @@ on:
default: "develop"

jobs:
test:
name: "🧪 Test with coverage"
runs-on: ubuntu-latest
strategy:
matrix:
python-version: ["3.11", "3.10"]
env:
OS: linux
GITHUB_TOKEN: ${{ secrets.GITHUB_TOKEN }}
steps:
- name: "🛍️ Checkout repository"
uses: actions/checkout@v4
with:
ref: ${{ github.event.inputs.branch || github.ref }}
- name: "🐍 Setup Python"
uses: actions/setup-python@v4
with:
python-version: ${{ matrix.python-version }}
- name: "🧪 Run test and generate coverage report"
working-directory: .
run: |
echo "codecov.dev" > VERSION
make test
- name: "📦 Upload coverage artifact"
uses: actions/upload-artifact@v4
with:
name: coverage-report-${{ matrix.python-version }}
path: ./coverage.xml

upload:
name: "☁️ Upload coverage to Codecov"
runs-on: ubuntu-latest
needs: test
steps:
- name: "🛍️ Checkout repository"
uses: actions/checkout@v4
with:
ref: ${{ github.event.inputs.branch || github.ref }}
- name: "📥 Download coverage artifact"
uses: actions/download-artifact@v4
with:
name: coverage-report-3.10
- name: "☁️ Upload coverage to Codecov"
uses: codecov/codecov-action@v3
with:
token: ${{ secrets.CODECOV_UPLOAD_TOKEN_MMIF_PYTHON }}
files: ./coverage.xml
flags: unittests
env_vars: OS,PYTHON
name: coverage
fail_ci_if_error: true

test-and-codecov:
name: "🤙 Call SDK test workflow"
uses: clamsproject/.github/.github/workflows/sdk-codecov.yml@main
secrets:
CC_REPO_UPLOAD_TOKEN: ${{ secrets.CODECOV_UPLOAD_TOKEN_MMIF_PYTHON }}
3 changes: 1 addition & 2 deletions .github/workflows/publish.yml
Original file line number Diff line number Diff line change
Expand Up @@ -6,8 +6,7 @@ on:
- '[0-9]+.[0-9]+.[0-9]+'

jobs:
packge-and-upload:
package-and-upload:
name: "🤙 Call SDK publish workflow"
uses: clamsproject/.github/.github/workflows/sdk-publish.yml@main
secrets: inherit

29 changes: 29 additions & 0 deletions CHANGELOG.md
Original file line number Diff line number Diff line change
@@ -1,4 +1,33 @@

## releasing 1.0.19 (2024-07-29)
### Overview
Patch to fix a critical bug.

### Changes
- bugfix when `Annotation` instance and "warnings" view both are involved, MMIF is not properly returned (#299)

## releasing 1.0.18 (2024-07-15)
### Overview
Patch release with a bugfix.

### Additions
- document location (docloc) plugins now have a common function to provide formatting guidelines (https://github.com/clamsproject/mmif-python/issues/297)
### Changes
- fixed bug when adding custom properties to a newly generated `TextDocument` object (https://github.com/clamsproject/mmif-python/issues/290)

## releasing 1.0.17 (2024-06-26)
### Overview
This release adds caching mechanism for annotation alignments (via `Alignment` annotation, the alignment via `targets` property is not yet supported).

### Additions
- `Annotation` class now has [`.aligned_to_by(alignment: Annotation)`](https://clams.ai/mmif-python/latest/autodoc/mmif.serialize.html#mmif.serialize.annotation.Annotation.aligned_to_by) and [`.get_all_aligned()`](https://clams.ai/mmif-python/latest/autodoc/mmif.serialize.html#mmif.serialize.annotation.Annotation.get_all_aligned) method to quickly retrieve cached alignment counterparts (https://github.com/clamsproject/mmif-python/issues/285). The caching occurs
1. when MMIF JSON is deserialized
2. when `view.add_annotation` or `view.new_annotation` is called

### Changes
- `mmif.utils.text_document_helper.slice_text` received a major speed boost from the alignment caching.


## releasing 1.0.16 (2024-06-14)
### Overview
This release includes an _experimental_ implementation for helpers to slice `text_value` from text documents.
Expand Down
2 changes: 1 addition & 1 deletion docs/0.3.0/.buildinfo
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
# Sphinx build info version 1
# This file hashes the configuration used when building these files. When it is not found, a full rebuild will be done.
config: f096d2caba7303b9a2d38a50c0ba12a6
config: 150c922e863772efb719a199ed6b54a2
tags: 645f666f9bcd5a90fca523b33c5a78b7
Binary file modified docs/0.3.0/.doctrees/autodoc/mmif.serialize.doctree
Binary file not shown.
Binary file modified docs/0.3.0/.doctrees/autodoc/mmif.vocabulary.doctree
Binary file not shown.
Binary file modified docs/0.3.0/.doctrees/consumer-tutorial.doctree
Binary file not shown.
Binary file modified docs/0.3.0/.doctrees/environment.pickle
Binary file not shown.
Binary file modified docs/0.3.0/.doctrees/index.doctree
Binary file not shown.
Binary file modified docs/0.3.0/.doctrees/introduction.doctree
Binary file not shown.
Binary file modified docs/0.3.0/.doctrees/modules.doctree
Binary file not shown.
3 changes: 3 additions & 0 deletions docs/0.3.0/autodoc/mmif.serialize.html
Original file line number Diff line number Diff line change
Expand Up @@ -350,6 +350,9 @@ <h2>mmif.serialize.view module<a class="headerlink" href="#mmif-serialize-view-m
<dd><a href="../../1.0.14/autodoc/mmif.serialize.html">1.0.14</a></dd>
<dd><a href="../../1.0.15/autodoc/mmif.serialize.html">1.0.15</a></dd>
<dd><a href="../../1.0.16/autodoc/mmif.serialize.html">1.0.16</a></dd>
<dd><a href="../../1.0.17/autodoc/mmif.serialize.html">1.0.17</a></dd>
<dd><a href="../../1.0.18/autodoc/mmif.serialize.html">1.0.18</a></dd>
<dd><a href="../../1.0.19/autodoc/mmif.serialize.html">1.0.19</a></dd>
<dd><a href="../../1.0.2/autodoc/mmif.serialize.html">1.0.2</a></dd>
<dd><a href="../../1.0.3/autodoc/mmif.serialize.html">1.0.3</a></dd>
<dd><a href="../../1.0.4/autodoc/mmif.serialize.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/autodoc/mmif.vocabulary.html
Original file line number Diff line number Diff line change
Expand Up @@ -287,6 +287,9 @@ <h1>mmif.vocabulary module<a class="headerlink" href="#mmif-vocabulary-module" t
<dd><a href="../../1.0.14/autodoc/mmif.vocabulary.html">1.0.14</a></dd>
<dd><a href="../../1.0.15/autodoc/mmif.vocabulary.html">1.0.15</a></dd>
<dd><a href="../../1.0.16/autodoc/mmif.vocabulary.html">1.0.16</a></dd>
<dd><a href="../../1.0.17/autodoc/mmif.vocabulary.html">1.0.17</a></dd>
<dd><a href="../../1.0.18/autodoc/mmif.vocabulary.html">1.0.18</a></dd>
<dd><a href="../../1.0.19/autodoc/mmif.vocabulary.html">1.0.19</a></dd>
<dd><a href="../../1.0.2/autodoc/mmif.vocabulary.html">1.0.2</a></dd>
<dd><a href="../../1.0.3/autodoc/mmif.vocabulary.html">1.0.3</a></dd>
<dd><a href="../../1.0.4/autodoc/mmif.vocabulary.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/consumer-tutorial.html
Original file line number Diff line number Diff line change
Expand Up @@ -156,6 +156,9 @@
<dd><a href="../1.0.14/consumer-tutorial.html">1.0.14</a></dd>
<dd><a href="../1.0.15/consumer-tutorial.html">1.0.15</a></dd>
<dd><a href="../1.0.16/consumer-tutorial.html">1.0.16</a></dd>
<dd><a href="../1.0.17/consumer-tutorial.html">1.0.17</a></dd>
<dd><a href="../1.0.18/consumer-tutorial.html">1.0.18</a></dd>
<dd><a href="../1.0.19/consumer-tutorial.html">1.0.19</a></dd>
<dd><a href="../1.0.2/consumer-tutorial.html">1.0.2</a></dd>
<dd><a href="../1.0.3/consumer-tutorial.html">1.0.3</a></dd>
<dd><a href="../1.0.4/consumer-tutorial.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/genindex.html
Original file line number Diff line number Diff line change
Expand Up @@ -388,6 +388,9 @@ <h2 id="V">V</h2>
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/index.html
Original file line number Diff line number Diff line change
Expand Up @@ -182,6 +182,9 @@ <h1>Indices and tables<a class="headerlink" href="#indices-and-tables" title="Pe
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/introduction.html
Original file line number Diff line number Diff line change
Expand Up @@ -212,6 +212,9 @@ <h2>MMIF Serialization<a class="headerlink" href="#mmif-serialization" title="Pe
<dd><a href="../1.0.14/introduction.html">1.0.14</a></dd>
<dd><a href="../1.0.15/introduction.html">1.0.15</a></dd>
<dd><a href="../1.0.16/introduction.html">1.0.16</a></dd>
<dd><a href="../1.0.17/introduction.html">1.0.17</a></dd>
<dd><a href="../1.0.18/introduction.html">1.0.18</a></dd>
<dd><a href="../1.0.19/introduction.html">1.0.19</a></dd>
<dd><a href="../1.0.2/introduction.html">1.0.2</a></dd>
<dd><a href="../1.0.3/introduction.html">1.0.3</a></dd>
<dd><a href="../1.0.4/introduction.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/modules.html
Original file line number Diff line number Diff line change
Expand Up @@ -230,6 +230,9 @@
<dd><a href="../1.0.14/modules.html">1.0.14</a></dd>
<dd><a href="../1.0.15/modules.html">1.0.15</a></dd>
<dd><a href="../1.0.16/modules.html">1.0.16</a></dd>
<dd><a href="../1.0.17/modules.html">1.0.17</a></dd>
<dd><a href="../1.0.18/modules.html">1.0.18</a></dd>
<dd><a href="../1.0.19/modules.html">1.0.19</a></dd>
<dd><a href="../1.0.2/modules.html">1.0.2</a></dd>
<dd><a href="../1.0.3/modules.html">1.0.3</a></dd>
<dd><a href="../1.0.4/modules.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/py-modindex.html
Original file line number Diff line number Diff line change
Expand Up @@ -172,6 +172,9 @@ <h1>Python Module Index</h1>
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.0/search.html
Original file line number Diff line number Diff line change
Expand Up @@ -150,6 +150,9 @@
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
2 changes: 1 addition & 1 deletion docs/0.3.1/.buildinfo
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
# Sphinx build info version 1
# This file hashes the configuration used when building these files. When it is not found, a full rebuild will be done.
config: 9f6137b002d005e941db6d845325d5ec
config: d3469bc3b05653ee0812ea4a9c7dec40
tags: 645f666f9bcd5a90fca523b33c5a78b7
Binary file modified docs/0.3.1/.doctrees/autodoc/mmif.serialize.doctree
Binary file not shown.
Binary file modified docs/0.3.1/.doctrees/autodoc/mmif.vocabulary.doctree
Binary file not shown.
Binary file modified docs/0.3.1/.doctrees/consumer-tutorial.doctree
Binary file not shown.
Binary file modified docs/0.3.1/.doctrees/environment.pickle
Binary file not shown.
Binary file modified docs/0.3.1/.doctrees/index.doctree
Binary file not shown.
Binary file modified docs/0.3.1/.doctrees/introduction.doctree
Binary file not shown.
Binary file modified docs/0.3.1/.doctrees/modules.doctree
Binary file not shown.
3 changes: 3 additions & 0 deletions docs/0.3.1/autodoc/mmif.serialize.html
Original file line number Diff line number Diff line change
Expand Up @@ -350,6 +350,9 @@ <h2>mmif.serialize.view module<a class="headerlink" href="#mmif-serialize-view-m
<dd><a href="../../1.0.14/autodoc/mmif.serialize.html">1.0.14</a></dd>
<dd><a href="../../1.0.15/autodoc/mmif.serialize.html">1.0.15</a></dd>
<dd><a href="../../1.0.16/autodoc/mmif.serialize.html">1.0.16</a></dd>
<dd><a href="../../1.0.17/autodoc/mmif.serialize.html">1.0.17</a></dd>
<dd><a href="../../1.0.18/autodoc/mmif.serialize.html">1.0.18</a></dd>
<dd><a href="../../1.0.19/autodoc/mmif.serialize.html">1.0.19</a></dd>
<dd><a href="../../1.0.2/autodoc/mmif.serialize.html">1.0.2</a></dd>
<dd><a href="../../1.0.3/autodoc/mmif.serialize.html">1.0.3</a></dd>
<dd><a href="../../1.0.4/autodoc/mmif.serialize.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/autodoc/mmif.vocabulary.html
Original file line number Diff line number Diff line change
Expand Up @@ -287,6 +287,9 @@ <h1>mmif.vocabulary module<a class="headerlink" href="#mmif-vocabulary-module" t
<dd><a href="../../1.0.14/autodoc/mmif.vocabulary.html">1.0.14</a></dd>
<dd><a href="../../1.0.15/autodoc/mmif.vocabulary.html">1.0.15</a></dd>
<dd><a href="../../1.0.16/autodoc/mmif.vocabulary.html">1.0.16</a></dd>
<dd><a href="../../1.0.17/autodoc/mmif.vocabulary.html">1.0.17</a></dd>
<dd><a href="../../1.0.18/autodoc/mmif.vocabulary.html">1.0.18</a></dd>
<dd><a href="../../1.0.19/autodoc/mmif.vocabulary.html">1.0.19</a></dd>
<dd><a href="../../1.0.2/autodoc/mmif.vocabulary.html">1.0.2</a></dd>
<dd><a href="../../1.0.3/autodoc/mmif.vocabulary.html">1.0.3</a></dd>
<dd><a href="../../1.0.4/autodoc/mmif.vocabulary.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/consumer-tutorial.html
Original file line number Diff line number Diff line change
Expand Up @@ -156,6 +156,9 @@
<dd><a href="../1.0.14/consumer-tutorial.html">1.0.14</a></dd>
<dd><a href="../1.0.15/consumer-tutorial.html">1.0.15</a></dd>
<dd><a href="../1.0.16/consumer-tutorial.html">1.0.16</a></dd>
<dd><a href="../1.0.17/consumer-tutorial.html">1.0.17</a></dd>
<dd><a href="../1.0.18/consumer-tutorial.html">1.0.18</a></dd>
<dd><a href="../1.0.19/consumer-tutorial.html">1.0.19</a></dd>
<dd><a href="../1.0.2/consumer-tutorial.html">1.0.2</a></dd>
<dd><a href="../1.0.3/consumer-tutorial.html">1.0.3</a></dd>
<dd><a href="../1.0.4/consumer-tutorial.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/genindex.html
Original file line number Diff line number Diff line change
Expand Up @@ -388,6 +388,9 @@ <h2 id="V">V</h2>
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/index.html
Original file line number Diff line number Diff line change
Expand Up @@ -182,6 +182,9 @@ <h1>Indices and tables<a class="headerlink" href="#indices-and-tables" title="Pe
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/introduction.html
Original file line number Diff line number Diff line change
Expand Up @@ -212,6 +212,9 @@ <h2>MMIF Serialization<a class="headerlink" href="#mmif-serialization" title="Pe
<dd><a href="../1.0.14/introduction.html">1.0.14</a></dd>
<dd><a href="../1.0.15/introduction.html">1.0.15</a></dd>
<dd><a href="../1.0.16/introduction.html">1.0.16</a></dd>
<dd><a href="../1.0.17/introduction.html">1.0.17</a></dd>
<dd><a href="../1.0.18/introduction.html">1.0.18</a></dd>
<dd><a href="../1.0.19/introduction.html">1.0.19</a></dd>
<dd><a href="../1.0.2/introduction.html">1.0.2</a></dd>
<dd><a href="../1.0.3/introduction.html">1.0.3</a></dd>
<dd><a href="../1.0.4/introduction.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/modules.html
Original file line number Diff line number Diff line change
Expand Up @@ -230,6 +230,9 @@
<dd><a href="../1.0.14/modules.html">1.0.14</a></dd>
<dd><a href="../1.0.15/modules.html">1.0.15</a></dd>
<dd><a href="../1.0.16/modules.html">1.0.16</a></dd>
<dd><a href="../1.0.17/modules.html">1.0.17</a></dd>
<dd><a href="../1.0.18/modules.html">1.0.18</a></dd>
<dd><a href="../1.0.19/modules.html">1.0.19</a></dd>
<dd><a href="../1.0.2/modules.html">1.0.2</a></dd>
<dd><a href="../1.0.3/modules.html">1.0.3</a></dd>
<dd><a href="../1.0.4/modules.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/py-modindex.html
Original file line number Diff line number Diff line change
Expand Up @@ -172,6 +172,9 @@ <h1>Python Module Index</h1>
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.1/search.html
Original file line number Diff line number Diff line change
Expand Up @@ -150,6 +150,9 @@
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
2 changes: 1 addition & 1 deletion docs/0.3.2/.buildinfo
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
# Sphinx build info version 1
# This file hashes the configuration used when building these files. When it is not found, a full rebuild will be done.
config: a1db89997b11b32a40862bf4e6982e25
config: da12509f945aa2f708bf50e2a203555c
tags: 645f666f9bcd5a90fca523b33c5a78b7
Binary file modified docs/0.3.2/.doctrees/autodoc/mmif.serialize.doctree
Binary file not shown.
Binary file modified docs/0.3.2/.doctrees/autodoc/mmif.vocabulary.doctree
Binary file not shown.
Binary file modified docs/0.3.2/.doctrees/consumer-tutorial.doctree
Binary file not shown.
Binary file modified docs/0.3.2/.doctrees/environment.pickle
Binary file not shown.
Binary file modified docs/0.3.2/.doctrees/index.doctree
Binary file not shown.
Binary file modified docs/0.3.2/.doctrees/introduction.doctree
Binary file not shown.
Binary file modified docs/0.3.2/.doctrees/modules.doctree
Binary file not shown.
3 changes: 3 additions & 0 deletions docs/0.3.2/autodoc/mmif.serialize.html
Original file line number Diff line number Diff line change
Expand Up @@ -350,6 +350,9 @@ <h2>mmif.serialize.view module<a class="headerlink" href="#mmif-serialize-view-m
<dd><a href="../../1.0.14/autodoc/mmif.serialize.html">1.0.14</a></dd>
<dd><a href="../../1.0.15/autodoc/mmif.serialize.html">1.0.15</a></dd>
<dd><a href="../../1.0.16/autodoc/mmif.serialize.html">1.0.16</a></dd>
<dd><a href="../../1.0.17/autodoc/mmif.serialize.html">1.0.17</a></dd>
<dd><a href="../../1.0.18/autodoc/mmif.serialize.html">1.0.18</a></dd>
<dd><a href="../../1.0.19/autodoc/mmif.serialize.html">1.0.19</a></dd>
<dd><a href="../../1.0.2/autodoc/mmif.serialize.html">1.0.2</a></dd>
<dd><a href="../../1.0.3/autodoc/mmif.serialize.html">1.0.3</a></dd>
<dd><a href="../../1.0.4/autodoc/mmif.serialize.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.2/autodoc/mmif.vocabulary.html
Original file line number Diff line number Diff line change
Expand Up @@ -287,6 +287,9 @@ <h1>mmif.vocabulary module<a class="headerlink" href="#mmif-vocabulary-module" t
<dd><a href="../../1.0.14/autodoc/mmif.vocabulary.html">1.0.14</a></dd>
<dd><a href="../../1.0.15/autodoc/mmif.vocabulary.html">1.0.15</a></dd>
<dd><a href="../../1.0.16/autodoc/mmif.vocabulary.html">1.0.16</a></dd>
<dd><a href="../../1.0.17/autodoc/mmif.vocabulary.html">1.0.17</a></dd>
<dd><a href="../../1.0.18/autodoc/mmif.vocabulary.html">1.0.18</a></dd>
<dd><a href="../../1.0.19/autodoc/mmif.vocabulary.html">1.0.19</a></dd>
<dd><a href="../../1.0.2/autodoc/mmif.vocabulary.html">1.0.2</a></dd>
<dd><a href="../../1.0.3/autodoc/mmif.vocabulary.html">1.0.3</a></dd>
<dd><a href="../../1.0.4/autodoc/mmif.vocabulary.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.2/consumer-tutorial.html
Original file line number Diff line number Diff line change
Expand Up @@ -156,6 +156,9 @@
<dd><a href="../1.0.14/consumer-tutorial.html">1.0.14</a></dd>
<dd><a href="../1.0.15/consumer-tutorial.html">1.0.15</a></dd>
<dd><a href="../1.0.16/consumer-tutorial.html">1.0.16</a></dd>
<dd><a href="../1.0.17/consumer-tutorial.html">1.0.17</a></dd>
<dd><a href="../1.0.18/consumer-tutorial.html">1.0.18</a></dd>
<dd><a href="../1.0.19/consumer-tutorial.html">1.0.19</a></dd>
<dd><a href="../1.0.2/consumer-tutorial.html">1.0.2</a></dd>
<dd><a href="../1.0.3/consumer-tutorial.html">1.0.3</a></dd>
<dd><a href="../1.0.4/consumer-tutorial.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.2/genindex.html
Original file line number Diff line number Diff line change
Expand Up @@ -388,6 +388,9 @@ <h2 id="V">V</h2>
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.2/index.html
Original file line number Diff line number Diff line change
Expand Up @@ -182,6 +182,9 @@ <h1>Indices and tables<a class="headerlink" href="#indices-and-tables" title="Pe
<dd><a href="../1.0.14/index.html">1.0.14</a></dd>
<dd><a href="../1.0.15/index.html">1.0.15</a></dd>
<dd><a href="../1.0.16/index.html">1.0.16</a></dd>
<dd><a href="../1.0.17/index.html">1.0.17</a></dd>
<dd><a href="../1.0.18/index.html">1.0.18</a></dd>
<dd><a href="../1.0.19/index.html">1.0.19</a></dd>
<dd><a href="../1.0.2/index.html">1.0.2</a></dd>
<dd><a href="../1.0.3/index.html">1.0.3</a></dd>
<dd><a href="../1.0.4/index.html">1.0.4</a></dd>
Expand Down
3 changes: 3 additions & 0 deletions docs/0.3.2/introduction.html
Original file line number Diff line number Diff line change
Expand Up @@ -212,6 +212,9 @@ <h2>MMIF Serialization<a class="headerlink" href="#mmif-serialization" title="Pe
<dd><a href="../1.0.14/introduction.html">1.0.14</a></dd>
<dd><a href="../1.0.15/introduction.html">1.0.15</a></dd>
<dd><a href="../1.0.16/introduction.html">1.0.16</a></dd>
<dd><a href="../1.0.17/introduction.html">1.0.17</a></dd>
<dd><a href="../1.0.18/introduction.html">1.0.18</a></dd>
<dd><a href="../1.0.19/introduction.html">1.0.19</a></dd>
<dd><a href="../1.0.2/introduction.html">1.0.2</a></dd>
<dd><a href="../1.0.3/introduction.html">1.0.3</a></dd>
<dd><a href="../1.0.4/introduction.html">1.0.4</a></dd>
Expand Down
Loading
Loading