A flexible simulation framework for evaluating Material Flow Control (MFC) strategies in disassembly systems
🔬 Research Software Notice
This is a research prototype (v2025.09) developed for academic purposes. It has been verified for the specific scenarios presented in the accompanying research article. Please refer to LIMITATIONS.md for more information about the assumptions, scope, and known limitations.
Patrick Jordan: patrick.jordan@iwb.tum.de
- 
Visit our other repositories
Explore more tools and resources from our research institute. - 
Visit our institute for more information
Learn more about our research and ongoing projects. 
This repository provides a modular simulation framework for evaluating Material Flow Control (MFC) strategies in disassembly systems. The framework enables researchers and production planners to assess and compare various pool sequencing and shop floor dispatching rules for disassembly operations. The tools include:
This implementation represents a research prototype that:
- ✅ has been verified for the scenarios described in the paper (9 rule combinations, 70 orders)
 - ✅ correctly implements the LUMS-COR mechanism and dispatching rules
 - ✅ produces reproducible results for the published experiments
 ⚠️ makes specific assumptions - see LIMITATIONS.md⚠️ may require modifications for different use cases
The framework includes:
- DAMFC Core Framework: a Python-based discrete event simulation that uses SimPy to model disassembly systems with stochastic processing times and uncertain product conditions
 - LUMS-COR Implementation: Lancaster University Management School Corrected Order Release mechanism with Planned Completion at Workstation (PCAW) calculations for workload control
 - Visualization Tools: bar charts for analyzing simulation results
 
⚠️ Note Updated after the publication of the research article
The framework is part of the research published in the following article:
"Simulation Framework For Evaluating Pool Sequencing And Shop Floor Dis-patching Rules In Disassembly"
P. Jordan, H. Zhang, M. Wegmann, L. Streibel, C. Reuter, M. F. Zaeh
Presented at [Conference (Year)]. [Updated after publication]
For more details, please refer to the published article (Link) [Link is inserted after publication]
Due to the trend towards a circular economy, the efficient management of end-of-life products and disassembly has become more important. This repository provides a modular simulation framework for evaluating and comparing various production control strategies in disassembly systems. The framework integrates and evaluates different material flow control methods, including the Lancaster University Management School Corrected Order Release (LUMS-COR) approach and various pool sequencing and shop floor dispatching rule combinations. Key performance indicators such as resource utilization, throughput time, and profitability can be assessed, enabling the evaluation of the effectiveness of a chosen combination of pool sequencing and shop floor dispatching rules.
This research was funded by the Federal Ministry for Economic Affairs and Energy (BMWE) as part of the "Car2Car" project (19S22007H).
The framework implements a modular architecture with several core components.
Core Components:
- 
Configuration Layer (
appConfig.py)- reads disassembly process plans from the 
input/folder - defines system parameters, such as workload norms, and dispatching rules
 - configures the simulation environment
 
 - reads disassembly process plans from the 
 - 
Control Layer
OrderReleaseControl: implements the LUMS-COR mechanism with pool sequencing rulesPreShopPool: manages the order queue and release decisionsOrderGenerator: creates orders based on stochastic arrival patterns
 - 
Execution Layer
MainSimulation: orchestrates the simulation executionWorkStation: processes tasks according to dispatching rulesWarehouse: stores completed components
 - 
Analysis Layer
Note: This layer is not visualized in Figure 1. The calculation is done by accessing the generated data from the system (architecture).kpiTracker: calculates performance metricsloggerConfig: records detailed event logs for analysis and verificationprocessCSV: generates summary reports
 
Before running simulations, please review the LIMITATIONS.md file to understand the tested parameter ranges and assumptions.
- 
Clone the repository:
git clone https://github.com/iwb/ce-damfc-simulation.git cd disassembly-mfc - 
Install dependencies:
pip install -r requirements.txt
 
The framework can run in three modes:
This mode executes all nine rule combinations as outlined in the research article.
python run_simulation.pyThis runs the complete set of scenarios:
- Simulation1: FCFS + FCFS
 - Simulation2: FCFS + SPT
 - Simulation3: FCFS + PST
 - Simulation4: CR + FCFS
 - Simulation5: CR + SPT
 - Simulation6: CR + PST
 - Simulation7: EDD + FCFS
 - Simulation8: EDD + SPT
 - Simulation9: EDD + PST
 
It is possible to run a single simulation using the rules configured in damfc/appConfig.py.
python run_simulation.py --singleBefore running in single mode, configure your desired rules in damfc/appConfig.py.
POOL_SEQUENCING_RULE = "CR"   # Options: "FCFS", "CR", "EDD"
DISPATCHING_RULE = "SPT"      # Options: "FCFS", "SPT", "PST"- FCFS (First-Come-First-Served): orders are released in arrival sequence
 - CR (Critical Ratio): priority is based on (time remaining)/(processing time)
 - EDD (Earliest Due Date): orders with the earliest due dates are released first
 
- FCFS (First-Come-First-Served): tasks are processed in the order they arrive at the workstation
 - SPT (Shortest Processing Time): shortest tasks are processed first
 - PST (Planned Start Time): tasks are dispatched based on backward scheduling from the due date
 
For quick testing with reduced complexity, use the test module.
cd damfc
python test.pyThis runs a simplified scenario with:
- six orders (instead of 70)
 - 20 time units (instead of 100)
 - single instance per workstation type
 - deactivated bar charts
 
In addition to selecting pool sequencing and dispatching rules, other system parameters can be adjusted in damfc/appConfig.py.
# System Parameters
WORKLOAD_NORM = 10             # Workload threshold (WIP limit)
SIMULATION_TIME = 100          # Total simulation duration
TOTAL_ORDERS = 70              # Number of orders to generate
# Order Generation
INTER_ARRIVAL_TIME_MEAN = 0.648  # Mean time between order arrivals
DUE_DATE_RANGE = (40, 50)        # Random due date range
# Workstation Configuration
STATION_TYPES = ['A', 'B', 'C', 'D', 'E']
STATION_INSTANCES = {'A': 2, 'B': 2, 'C': 2, 'D': 3, 'E': 1}All results are saved in the output/ directory.
| File | Description | 
|---|---|
summary_simulation.csv | 
overall KPIs for each simulation (throughput, profit, etc.) | 
summary_orders.csv | 
detailed order-level results | 
summary_stations.csv | 
workstation utilization and idle times | 
log_events.csv | 
complete event log for debugging and validation | 
log_order_specific.csv | 
task execution timeline for each order | 
log_station_specific.csv | 
task processing history for each station | 
After the simulation run is complete, the Event Log Explorer and Results Viewer are automatically displayed.
An Interactive log viewer with search and filter capabilities
Features:
- Chronological View: events are sorted by timestamp
 - Search/Filter Capability:
- find specific order IDs by entering an order ID (e.g., "O-11")
 - filter by station ID (e.g., "B-1")
 - search event types (e.g., "task complete")
 
 - Double-Click Details: click any row to view complete order information
 
Closing the Event Log Explorer opens the "Combined Simulation Results" window, which presents the simulation results in a tabbed interface with three main components.
1. KPI Table Tab
Table displaying comprehensive performance metrics
- information and metrics shown:
- Rules: pool sequencing and shop floor dispatching rule combination (e.g., "FCFS + SPT")
 - Total Orders: number of orders generated and processed during the simulation (default: 70)
 - Workload Norm: applied threshold for order release
 - Overdue Orders: count of orders exceeding due dates
 - Unfinished Orders: orders not completed within the simulated time
 - Throughput Time Mean: average time for orders to be completed
 - Idle/Work Time: cumulative times across all workstations
 - Net Profit: revenue minus process costs
 
 - includes an adjustable font size slider for better readability
 
2. Idle Time Plot Tab
Bar chart visualization comparing idle times across workstations
- grouped bars by workstation for each simulation scenario (rule combination)
 - supports the identification of:
- workstations with excessive downtime
 - the impact of different sequencing strategies on idle time
 - bottlenecks in the system
 
 
3. Utilization Plot Tab
Bar chart showing the percentage utilization for each workstation
- calculated as: (Work Time / Total Simulation Time) × 100
 - allows for visual comparison across different rule combinations
 - assists in:
- identifying underutilized resources
 - detecting overburdened workstations
 - optimizing workload distribution
 
 
disassembly-mfc/
├── damfc/                      # Main simulation modules
│   ├── appConfig.py            # Configuration and scenarios
│   ├── kpiTracker.py           # KPI calculation and visualization
│   ├── loggerConfig.py         # Event logging
│   ├── main.py                 # Simulation environment setup
│   ├── orderReleaseControl.py  # Order release mechanisms
│   ├── preShopPool.py          # Order buffering
│   ├── processCSV.py           # Log processing
│   ├── test.py                 # Test scenarios
│   ├── warehouse.py            # Component storage
│   └── workstation.py          # Workstation processing logic
├── input/                      # Process plans
│   ├── dpp1.json               # Disassembly process plan 1
│   └── dpp2.json               # Disassembly process plan 2
├── output/                     # Simulation results
│   ├── app_*.log               # Debug logs
│   ├── log_*.csv               # Event logs
│   └── summary_*.csv           # Performance summaries
├── LIMITATIONS.md              # Known limitations and assumptions
├── README.md                   # This file
├── requirements.txt            # Python dependencies
└── run_simulation.py           # Main entry point
To add custom disassembly process plans:
- create a new JSON file in 
input/following the structure of existing plans - reference it in 
damfc/appConfig.py.with open('input/custom_plan.json') as file: CUSTOM_PLAN = json.load(file)
 - update the OrderGenerator class to include the new plan
 
If you use this repository or the tools for your research or industry projects, please cite the following article:
⚠️ Note Updated after the publication of the research article
@article{example_key,
title = {Example Title},
journal = {...}
}This repository and its contents are licensed under the MIT License.
For questions, suggestions, or collaboration opportunities, please contact the corresponding author or visit our institute website.