Skip to content

update deps

update deps #374

Triggered via push January 21, 2025 19:56
Status Failure
Total duration 1m 8s
Artifacts

ci.yaml

on: push
Matrix: Pre-commit
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Pre-commit (3.9)
Process completed with exit code 1.
Pre-commit (3.10)
The job was canceled because "_3_9" failed.
Pre-commit (3.10)
The operation was canceled.
Pre-commit (3.12)
The job was canceled because "_3_9" failed.
Pre-commit (3.12)
The operation was canceled.
Pre-commit (3.11)
The job was canceled because "_3_9" failed.
Pre-commit (3.11)
The operation was canceled.