Skip to content
Draft
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
133 changes: 133 additions & 0 deletions tpsa/TPSA_FIXEDSTRESS.DATA
Original file line number Diff line number Diff line change
@@ -0,0 +1,133 @@
-- This reservoir simulation deck is made available under the Open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/. Any rights in
-- individual contents of the database are licensed under the Database Contents
-- License: http://opendatacommons.org/licenses/dbcl/1.0/

-- Copyright (C) 2025 NORCE Research AS

-- Single phase flow + TPSA with fixed-stress coupling
---------------------------------------------------------------------------
RUNSPEC
---------------------------------------------------------------------------
DIMENS
5 5 5 /

EQLDIMS
/
TABDIMS
/

WATER
METRIC
MECH

TPSA
FIXED-STRESS /

START
1 'JAN' 2025 /

WELLDIMS
2 10 1 2 /

UNIFOUT

---------------------------------------------------------------------------
GRID
---------------------------------------------------------------------------
INIT

DX
125*20.0 /
DY
125*20.0 /
DZ
125*20.0 /
TOPS
25*1000.0 /

PORO
125*0.3 /

PERMX
125*500.0 /
COPY
PERMX PERMY /
PERMX PERMZ /
/

BIOTCOEF
125*0.87 /
SMODULUS
125*3.5 /
LAME
125*4.0 /

---------------------------------------------------------------------------
PROPS
---------------------------------------------------------------------------
PVTW
1.0 /

ROCK
1.0132 1.0E-6 /

ROCKOPTS
1* STORE /

DENSITY
859.5 1033.0 0.854 /

---------------------------------------------------------------------------
SOLUTION
---------------------------------------------------------------------------
EQUIL
1000 100 /

RPTRST
'BASIC=2' /

---------------------------------------------------------------------------
SUMMARY
---------------------------------------------------------------------------

---------------------------------------------------------------------------
SCHEDULE
---------------------------------------------------------------------------
RPTRST
'BASIC=2' /

WELSPECS
INJE G 2 2 1* WAT /
PROD G 4 4 1* WAT /
/
COMPDAT
INJE 1* 1* 1 5 OPEN 1* 1* 0.2 /
PROD 1* 1* 1 5 OPEN 1* 1* 0.2 /
/
WCONINJE
INJE WAT OPEN RATE 1000.0 1* 900 /
/
WCONPROD
PROD OPEN WRAT 1* 1000.0 /
/

TSTEP
5*1
/
WCONPROD
PROD OPEN WRAT 1* 900.0 /
/

TSTEP
5*1
/
WCONPROD
PROD OPEN WRAT 1* 950.0 /
/

TSTEP
5*1
/

END
133 changes: 133 additions & 0 deletions tpsa/TPSA_LAGGED.DATA
Original file line number Diff line number Diff line change
@@ -0,0 +1,133 @@
-- This reservoir simulation deck is made available under the Open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/. Any rights in
-- individual contents of the database are licensed under the Database Contents
-- License: http://opendatacommons.org/licenses/dbcl/1.0/

-- Copyright (C) 2025 NORCE Research AS

-- Single phase flow + TPSA with lagged coupling
---------------------------------------------------------------------------
RUNSPEC
---------------------------------------------------------------------------
DIMENS
5 5 5 /

EQLDIMS
/
TABDIMS
/

WATER
METRIC
MECH

TPSA
LAGGED /

START
1 'JAN' 2025 /

WELLDIMS
2 10 1 2 /

UNIFOUT

---------------------------------------------------------------------------
GRID
---------------------------------------------------------------------------
INIT

DX
125*20.0 /
DY
125*20.0 /
DZ
125*20.0 /
TOPS
25*1000.0 /

PORO
125*0.3 /

PERMX
125*500.0 /
COPY
PERMX PERMY /
PERMX PERMZ /
/

BIOTCOEF
125*0.87 /
SMODULUS
125*3.5 /
LAME
125*4.0 /

---------------------------------------------------------------------------
PROPS
---------------------------------------------------------------------------
PVTW
1.0 /

ROCK
1.0132 1.0E-6 /

ROCKOPTS
1* STORE /

DENSITY
859.5 1033.0 0.854 /

---------------------------------------------------------------------------
SOLUTION
---------------------------------------------------------------------------
EQUIL
1000 100 /

RPTRST
'BASIC=2' /

---------------------------------------------------------------------------
SUMMARY
---------------------------------------------------------------------------

---------------------------------------------------------------------------
SCHEDULE
---------------------------------------------------------------------------
RPTRST
'BASIC=2' /

WELSPECS
INJE G 2 2 1* WAT /
PROD G 4 4 1* WAT /
/
COMPDAT
INJE 1* 1* 1 5 OPEN 1* 1* 0.2 /
PROD 1* 1* 1 5 OPEN 1* 1* 0.2 /
/
WCONINJE
INJE WAT OPEN RATE 1000.0 1* 900 /
/
WCONPROD
PROD OPEN WRAT 1* 1000.0 /
/

TSTEP
5*1
/
WCONPROD
PROD OPEN WRAT 1* 900.0 /
/

TSTEP
5*1
/
WCONPROD
PROD OPEN WRAT 1* 950.0 /
/

TSTEP
5*1
/

END